2001-Until today
Full design and Inspection of the retrofit and expansion of the existing Holdrooms. The process started with Block F, and afterwards Stage I was built, which included Block A and B. The other blocks were built during Stage II that started in 2009. Design: 2001; Inspection: 2002-2010
Block G included the design and inspection of architectural, structural, civil, and electromechanical disciplines of new Holdroom building and the expansion of Holdroom building Block F. Nowadays, it has two new boarding positions with Passenger Boarding Bridges. Additionally, it has concession spaces for commercial tenants. Design: 2013; Inspection: 2014
El Coco, Alajuela