2011 a 2012
Structural design and design coordination, as well as supervision and coordination during the construction of the shopping center. It consists of 3 levels for commercial tenants and a basement as a parking lot, with concrete structure.
At the same time, the overpass, that allows access from Cartago to the building, was built.
La Lima, Cartago