2016 – Until today
Coordination of design from its conceptualization to the Inspection of works, of three areas surrounding the East and South end of the Runway, which consist of:
- Relocation of the road that connects the National Route 1 with La Candela Road, street clearance in front of hangars and relocation of the first section of La Candela Road.
- Creation of a new Taxiway and a Perimetral Road.
- Extension of the Active Runway with its RESA
- Creation of Connector Juliet and the connector towards the future Coopesa Hangar
- Expansion of the Taxiway
Currently under construction. We thank Edica Ltda., for providing aerial photographs.
El Coco, Alajuela