2017- Until today
Structural design and inspection of 16 buildings that make up the new production plant. The buildings are of variable dimensions but four stand out since they are the largest in area. The structures of the building complex incorporate design in both concrete and steel structure.
Since August 2018 it is under construction.
Liberia, Guanacaste