2009-2011 and 2016-2017
Review and analysis of the conceptual design of the Terminal Building expansion of the airport, done by the Infrastructure Department of DGAC. The project consists of a main Terminal Building, mechanical rooms, Holdrooms in 1st and 2nd floor respectively. Design 2009-2010; Inspection: 2010-2011
This building recently had an expansion of its Holdrooms; the structural design was developed in 2016 and the inspection in 2017.
Liberia, Guanacaste