Terminal Building

1995-2010

Architectural, civil, structural, electromechanical, urban planning and special equipment design of a 5-level building, parking lot, exterior works, access roads and mechanical room. The building was renovated in two stages, the first one in 1995 and the second one during 2009-2010.

El Coco, Alajuela